Monte Redondo is a 48 MW wind farm located in the Coquimbo Region. Plant/Central Summary Energy: Wind Capacity: 48 MW Generator: Engie Location: Coquimbo Region ID: 56-ENG07 Effective Date: 12/31/2023
Los Loros is a solar photovoltaic plant with a capacity of 46 MW located in the Atacama Region. Plant/Central Summary Energy: Solar Capacity: 46 MW Generator: Engie Location: Atacama Region ID: 56-ENG05 Effective Date: 12/31/2023
Ancoa is a run-of-river hydroelectric power plant with a capacity of 24 MW, located in the Maule Region. Plant/Central Summary Energy: Hydroelectric Capacity: 24 MW Generator: Hidro Ancoa Location: Maule Region ID: 56-ANCOA Effective Date: 11/31/2023
Finis Terrae is a solar photovoltaic plant with a capacity of 138 MW located in the Antofagasta Region. Plant/Central Summary Energy: Solar Capacity: 138 MW Generator: EGP Location: Antofagasta Region ID: 56ENEL05 Effective Date: 12/31/2023
Carrera Pinto is a solar photovoltaic plant with a capacity of 93 MW located in the Atacama Region of Chile. Plant/Central Summary Energy: Wind Capacity: 112 MW Generator: EGP Location: Atacama Region ID: 56ENEL03 Effective Date: 12/31/2023
Sierra Gorda E is a wind farm with a capacity of 112 MW located in the Antofagasta Region. Plant/Central Summary Energy: Wind Capacity: 112 MW Generator: EGP Location: Antofagasta Region ID: 56ENEL03 Effective Date: 12/31/2023
Renaico is a wind farm with a capacity of 88 MW located in the Araucanía Region. Plant/Central Summary Energy: Wind Capacity: 88 MW Generator: EGP Location: Araucanía Region ID: 56ENEL02 Effective Date: 12/31/2023
Rio Colorado is a run-of-river hydroelectric power plant with a capacity of 16.4 MW, located in the Maule Region. Plant/Central Summary Energy: Hydroelectric Capacity: 16.5 MW Generator: Hidro Rio Colorado Location: Maule Region ID: 56-HCO01 Effective Date: 12/31/2022
Lautaro I is a biomass power plant with a capacity of 26 MW, located in the Araucanía Region. Plant/Central Summary Energy: Biomass Capacity: 26 MW Generator: Comasa Location: Araucanía Region ID: LAUTARO1 Effective Date: 12/31/2020
Central Laja I is a hydroelectric power plant with a capacity of 34.4 MW, located in the Bio Bio Region. Plant/Central Summary Energy: Hydroelectric Capacity: 34.4 MW Generator: EMR Location: Bio Bío Region ID: 56-ENG04 Effective Date: 12/31/2022
El Aguila is a solar photovoltaic plant with a capacity of 2 MW, located in the Arica and Parinacota Region. Plant/Central Summary Energy: Solar Capacity: 2 MW Generator: Engie Location: Region of Arica y Parinacota ID: 56-ENG03 Effective Date: 12/31/2022
Pampa Camarones is a solar photovoltaic plant with a capacity of 6.2 MW, located in the Arica and Parinacota Region. Plant/Central Summary Energy: Solar Capacity: 6.2 MW Generator: Engie Location: Region of Arica y Parinacota ID: 56-ENG02 Effective Date: 12/31/2022
Chapiquiña is a hydroelectric power plant with a capacity of 10 MW, located in the Tarapacá Region. Plant/Central Summary Energy: Hydroelectric Capacity: 10.8 MW Generator: Engie Location: Antofagasta Region ID: 56-ENG01 Effective Date: 12/31/2022
Andes Solar I is a solar plant with a capacity of 21 MW, located in the Antofagasta Region. Plant/Central Summary Energy: Solar Capacity: 21 MW Generator: AES Solar Location: Antofagasta Region ID: 56990002 Effective Date: 12/31/2022
Alfalfal is a run-of-river hydroelectric power plant with a capacity of 178 MW, located in the Metropolitan Region of Chile. Plant/Central Summary Energy: Hydroelectric Capacity: 178 MW Generator: AES Andes Location: Metropolitan Region ID: 56990003 Effective Date: 12/31/2022
Los Cururos is a 109.4 MW wind farm located in the Coquimbo Region. Plant/Central Summary Energy: Wind Capacity: 109.4 MW Generator: AES Andes Location: Coquimbo Region ID: 56990004 Effective Date: 31-01-2024
El Toro is a dam hydroelectric power plant with a capacity of 450 MW, located in the Bio Bio Region. Plant/Central Summary Energy: Hydroelectric Capacity: 450 MW Generator: Enel Location: Bio Bío Region ID: ELTORO01 Effective Date: 28-02-2027
The Cerro Dominador photovoltaic plant has an installed capacity of 100 MW and consists of 392,000 panels that capture the sun's energy and transmit it directly to the grid. Plant/Central Summary Energy: Solar Capacity: 100 MW Generator: Cerro Dominador PV Location: Antofagasta Region ID: 56-CDOM1 Effective Date: 12/31/2024